BR-541 - Fast Lanes Shfaim
Project: Fast Lanes Shfaim
1/12
BR-541 is a 235m bridge that was built using the balanced cantilever method with precast elements.
The bridge is composed of five spans, with the longest span measuring 65.4m and a static height of 2.6m. It has a width of 36.0m and is constructed using three boxes that are linked by a cast-in-situ slab connection. Internal cantilever tendons and external continuous tendons have been employed to pre-stress the bridge.
BR-541 serves as a passage for Road 541 over Ayalon Road, as well as four rail tracks with platforms and gas pipes.