Shorek River Bridge Rehabilitation
Project: Highway 38 - Grade Separation
1/4
Bridge Description
The rehabilitation of this old bridge from the 70’s demanded a creative and cost-effective solution.
Compliance with new safety standards required changes to be made to the bridge structure. ViaBridges developed an improved solution that dramatically reduced costs by 90%, using additional post tension bolts to increase the bridge life cycle and durability.
Also, cocreate rehabilitations was conducted and bearing replacement.