BRE-01 - Road number 2 expansion
1/5
BRE-01 is an ecological underpass located beneath the Costal Road 2. Designed as a box-shaped structure with a clear span of 9.5 meters, this underpass was constructed using cast-in-situ technology. To ensure minimal disruption to traffic flow, the construction process was divided into three stages, with traffic arrangements carefully planned and implemented for each stage.
This underpass serves a critical ecological function by providing a safe passage for animals and travelers across the busy road above. Its construction demonstrates a commitment to sustainable infrastructure that balances the needs of transportation with the preservation of local ecosystems.